The Challenge With a busy schedule of social events to host in the newly built area of Llanfoist Village Hall, a speedy solution for a new floor was required. The calendar of events began in a mere 30 days and with traditional screed drying times needing in excess of 75...
Fast Drying Screed in Merthyr Tydfil
The Challenge When a distressed homeowner set out to rectify her rotting timber framed home in Merthyr Tydfil by building an extension on the back of her house, Flo-Screed UK Ltd were consulted by the Contractor to help find a solution to the internal floor. As the homeowner was still...
Old Girls School Aberdare
The Challenge To install a new floor that was strong enough and smooth enough for the construction company to convert the old building into a more useable space. Our Solution The solution provided was a liquid floor screed that would provide them with smooth floors to enable them to re-build...