The Challenge
With a busy schedule of social events to host in the newly built area of Llanfoist Village Hall, a speedy solution for a new floor was required. The calendar of events began in a mere 30 days and with traditional screed drying times needing in excess of 75 days to dry and take a final floor covering, a different solution would need to be found if the events were to go ahead.
Our Solution
The solution provided was fast drying liquid screed. Easy to install, with drying times of between 14 and 21 days and no sanding required, using this product enabled the main contractor to adjust the programme to suit. This meant the screed could be laid after the roof, windows and doors were installed and still hit the client’s deadline. This is something that would have not been possible with a conventional screed due to the 75 days of drying that would have been required.
Results & Benefits
All involved in the construction of the floor were extremely pleased with the installation and drying. It was able to be trafficked 24 hours after construction meaning that the contractor was soon able to gain access to the area and continue work, alongside this, the finished floor easily achieved a floor tolerance of SR2.